The plan was to plan and purchase during the beginning of December then lay into the project on Dec 20th and go non-stop over the next 2 weeks to finish it. Yes, we wanted to finish it during those 2 weeks. I kind'a looked at it this way: Those folks on TV can rebuild a whole house in a week. Surely I can redo a measly bathroom in 2 (ha ha).
So the 20th arrived, Poppop came over, the hammers came out, and the drywall came down. Demo took nearly 2 full days; longer than I had hoped, but we could make it up.
We had decided on an tub and toilet early on, but hadn't had a chance to pick any of it up. So Saturday morning we headed over to Lowes to do some buying. Once in the store, we met a very nice vendor who pointed out to us that the tub we wanted wasn't really white; it was more of a bone color. Thats a problem. As an alternative he pointed out to us that Lowes had on clearance they're remaining steel tubs...for $20. Mommy was sold instantly. The only trick; we had to drive to the New Castle Lowes to get one. By the time we got home and unloaded, Poppop had to leave for church. No biggie; we can make it up.


At this point, 41 days and counting, we're not 100% finished: Among the finishing details, we need to put quarter-round molding around the floor, I need to cut down one of the doors a bit more, and we need to paint the cabinet door I custom made. But everything is working and the space exceeded our expectations.
Domo arigato to Grammy for taking Aidan to her house for so many naps and to Poppop for all his hard work. Without you both we'd still be showering at our neighbor's.